Residential building Liverpool
- A montage of 8 – th floor.
- Ends with installation of staircases and elevator shafts on the 6th floor.
- Completed monolithic works on installation of entrance columns and
monolithic balconies on the front of the building.
Residential building in Cambridge
- Installation of the ground floor. The assembly of wall modules 1 floor
Oxford Residential building
- Ends with installation of the 1st floor. Under way solid work in the
overlap between the first and second floors.